Done with subfoor sheathing. Commence wall framing!

I’m finished covering the subfloor with 3/4″ plywood. With all the pipes and wires coming up from underneath, there was a lot of careful measuring, whole drilling, jig-saw cutting, etc. necessary, and everything needed to be fed through these wholes before the sheathing could be glued and screwed down. See images of some of these details below.

IMG_20130518_162602IMG_20130518_162519IMG_20130518_163410IMG_20130518_163437


Author: Alek Lisefski