IMG_20130518_163437

Done with subfoor sheathing. Commence wall framing!

I’m finished covering the subfloor with 3/4″ plywood. With all the pipes and wires coming up from underneath, there was a lot of careful measuring, whole drilling, jig-saw cutting, etc. necessary, and everything needed to be fed through these wholes before the sheathing could be glued and screwed down. See images of some of these details below.